PRODUCT

Converge HCA modules

Eight modules on one workspace, in the order a month closes. The workspace itself, with the dashboard, asset register, periods, roles, audit log, imports and API, comes with any module.

First-release scope. This page describes what the first release of Converge HCA covers. Book a demo to see what is ready today.

WORKSPACE

Included with every module

The ground every module stands on.

  • TodayThe day of the close, the blocking step and its owner, missing readings and open exceptions.
  • Assets and networkFields, facilities, wells, meters, tanks and pipelines, with effective dates.
  • Periods and locksOpen, soft-closed, locked, and reopened only with approval.
  • Audit logEvery change with before and after, who, when, why and from what source.
  • RolesPermissions per module and per action: enter, approve, lock, reopen.
  • UnitsField and SI units, both base conditions, exact conversions.
  • ImportsCSV and pasted spreadsheet ranges, with a mapping preview.
  • APIREST and MCP access to every record and calculation.

FIELD DATA

Readings checked as they arrive

Field data is where the month starts. Daily well and facility readings go into one entry grid, and validation rules catch problems on the day they happen, each with a severity and an owner, instead of at month-end.

Well tests are kept in a register with stability criteria and a validity window, so allocation only uses tests that were stable and current. Downtime carries a code and the volume deferred.

In the first release

  • Daily entry grid: hours on, chokes, pressures and tank gauges
  • Validation for range, rate of change, missing, frozen and duplicate values
  • Hours greater than the period flagged
  • Each exception with a severity and an owner
  • Well test register with stability criteria
  • Downtime and deferment codes with deferred volume

LATER RELEASES

Planned after the first release

Listed so you can plan around them. None of these is in the first release.

  • Flare, vent and fuel accounting, with Nigerian flare payments
  • Nominations and the lifting programme
  • Offline mobile entry for field data
  • Connectors for SCADA systems and historians
  • Flow-computer record import and recalculation checks
  • Mass and component allocation with recovery factors from Converge IOMT

Start with last month’s close.